What does the AI Saves calculator estimate?
The engine models one steady operating year of team capacity value for a defined workflow rather than predicting how fast an external AI model will run on your backlog.
Setup enters once at launch while monthly software fees and usable hours stay flat across 12 months. Switching currencies updates labels and formatting consistently across cards and reports without pulling live FX conversion rates.
How are the calculator inputs defined?
Inputs capture team size, total payroll cost, target task hours, and full tool spend. Keep every money entry in one currency and enter gross monthly pay per team member.
| Symbol | Input | Meaning |
|---|---|---|
| N | Employees | People performing the selected workflow |
| S | Monthly salary | Gross monthly pay per person before payroll burden |
| B | Employer cost multiplier | Loaded cost divided by gross pay; 1.2 equals 20% employer taxes and benefits |
| H | Paid hours per week | Total paid workweek per employee; defaults to 40 |
| T | Task hours per week | Weekly hours per person on the target task within paid hours |
| W | Working weeks per month | Shared month-length multiplier across paid and task hours |
| s | Net time-saving rate | Share of task hours removed after subtracting review and rework |
| r | Value realization rate | Share of freed time put to productive work; defaults to 75% |
| C / I | Monthly AI / setup costs | Total ongoing monthly fees / one-off implementation spend |
What formulas produce the results?
Hourly pay comes from dividing total loaded payroll across all paid hours first, ensuring net task savings and utilization never price part-time task hours as an employee’s entire salary. Rates use decimal fractions (25% = 0.25).
Sizing hourly rates against total paid hours prevents inflated savings claims that happen whenever analysts divide an employee’s full monthly salary solely across automated task hours.
| Output | Formula |
|---|---|
| Loaded monthly team cost | N × S × B |
| Paid hours per month | N × H × W |
| Loaded hourly cost | Loaded monthly team cost / paid hours per month |
| Task hours per month | N × T × W |
| Net hours saved | Task hours per month × s |
| Monthly capacity value | Net hours saved × loaded hourly cost × r |
| Net monthly value | Monthly capacity value − C |
| First-year net value | 12 × net monthly value − I |
| First-year investment | 12 × C + I |
| First-year ROI | First-year net value / first-year investment × 100 |
| Simple payback in months | I / net monthly value, when net monthly value is positive |
Can you reproduce a complete example?
Every output card verifies straight against the table above. Take five employees earning $5,000 monthly with a 1.2 employer multiplier across 40 weekly paid hours, 20 task hours weekly, and four weeks monthly.
Loaded team cost totals $30,000 across 800 paid hours, setting the hourly rate at $37.50. Target work covers 400 hours monthly; cutting 25% net frees 100 hours, worth $2,250 monthly at 60% capacity utilization.
Deducting $750 in monthly AI spend leaves $1,500 net monthly value. Paired with $6,000 upfront setup, year-one net value reaches $12,000 on $15,000 invested—yielding 80% ROI and four months simple payback from unrounded internals.
Are the presets and scenarios market benchmarks?
Presets exist purely as illustrative planning placeholders to exercise the formulas—never market norms, vendor quotes, or guaranteed outcomes. Swap in your payroll data, vendor bids, and pilot logs before budget reviews.
Defaulting utilization to 75% assumes three quarters of saved hours shift cleanly into productive tasks, whereas 100% implies zero scheduling friction. If your pilot clocked AI users exclusively, fold incomplete team adoption into net time saved rather than double-cutting utilization.
Conservative, base, and optimistic columns perform sensitivity brackets across your time-saving assumptions rather than computing statistical confidence intervals.
What are the model’s limits and edge cases?
Zero total investment leaves ROI percentage mathematically undefined, while zero or negative monthly net value produces no payback date. Zero setup combined with positive monthly net value triggers instant simple payback.
The constant-run model excludes phased rollout ramps, seasonal swings, NPV discounting, tax credits, severance charges, revenue attribution, and error liabilities—model those directly in an accompanying cash-flow tab whenever they decide the vote.
Valuing freed hours at hourly pay never proves cash payroll drops; only count direct cash savings where concrete expense lines shrink, without billing the same hour twice.
How should you improve the reliability of an estimate?
Swap guesses for pilot timings step by step, log every underlying quote date, and verify whether the case survives downside stress checks.
- Measure comparable workflows end to end with verification and rework included.
- Log sample sizes, collection dates, and complexity tags on observed metrics.
- Pair live vendor quotes with internal engineering and QA maintenance hours.
- Pin named owners onto the backlog or budget absorbing freed time.
- Re-run the numbers after pilot wrap-up or major process changes.
Frequently asked questions
Why does changing task hours not change the hourly labor cost?
Hourly cost derives from full paid weekly hours and full payroll—shrinking or expanding a single workflow alters task hours in scope, not what an employee costs per paid hour.
Does selecting a task type prove an automation rate?
No—preset buttons pre-fill example figures so you can explore quickly; only your own team’s pilot data validates what net time-saving rate applies.
Is the result a cash-flow forecast?
No—it outputs constant-month capacity valuation until you layer monthly billing schedules, rollout ramps, and verified spend cuts into a cash-flow projection.